Skip to content

Memorial Sloan Kettering – Koch Center for Cancer Care

Memorial Sloan Kettering called upon Fulcrum to assist with the development of their state-of-the-art 750K GSF cancer treatment and research facility from start to finish. Through in-depth design reviews, equipment specification assistance, enhanced commissioning services, and temporary operations support, Fulcrum’s team was crucial in ensuring that all of the facility’s high-tech energy and infrastructure systems were functioning at the highest level.

Building systems commissioned included:

  • Central chilled water plant and distribution
  • Microturbine cogeneration systems
  • Paralleling switchgear and substations
  • Emergency generators, automatic transfer switches, and emergency power distribution
  • Central heating plant and distribution
  • Central air handling units and distribution
  • Lab fume hoods, specialty exhaust and controls
  • Building automation systems