Prison System Central Utility Plant

When one of the country’s largest prison systems modernized their central energy systems, Fulcrum was selected as the energy performance contractor charged with scoping and constructing the new 2,000-ton central chiller plant that would anchor the campus’ cooling system. Fulcrum’s team designed and constructed a new system that interconnected with a recently constructed cogeneration plant, leveraging the high-pressure steam output to create both electrical power and cooling via backpressure steam turbines and absorption chillers. The project also installed new high-efficiency electric chillers, cooling towers, emergency power generators, and paralleling switchgear to provide resilient service to the 24/7/365 campus.